Concrete Channel along Cribbs Mill Creek Hargrove Road Precast Concrete Bridge Brookhaven Drive Precast Concrete Bridge Pedestrian Bridge and Sidewalks Demolition of Homes, Site Work, Fencing, Landscape Completed in 2020
Russell Chapel Road Water Tank
Fayetteville Water Authority
The Russell Chapel Road water tank is a 250,000 gallon bolted steel water tank with ceramic coating. Completed in 2011
Northwood Lake Spillway
City of Northport, Alabama
Replaced deteriorated concrete channel in local neighborhood to alleviate drainage issues. Completed in 1999.
Haleyville Sports Complex
City of Haleyville, Alabama Sports Quadplex with Concessions Building Site Work, Fencing, Lighting, Sidewalks, Irrigation, and Sod Completed in 2016
South Well and Treatment Plant
Coker Water Authority
Constructed a 400 GPM groundwater supply well and treatment facility, iron removal, aeration, sedimentation, pressure filters, and chlorine disinfection. Completed in 2012
Gulf States Well & Treatment Plant
Chilton Water Authority
Construction of a permitted 1400 GPM well with aeration, disinfection, water storage, high service pumps, and generator. Completed in 2002
Payne Well
Chilton Water Authority
Constructed a 700 GPM permitted well and pumps at Gulf States Treatment Plant. Completed in 2008
Thorsby Well No. 7
City of Thorsby, Alabama
Constructed a permit 700 GPM Well to pump water to Well No. 6 and the Treatment Plant. Completed in 2003
Roy’s Mill Sewer Pump Station
City of Jackson, Alabama
Rehabilitation of 1500 GPM sewer pump station, replacing pumps and controls, and adding a generator. Completed in 2025
Airport Runway Resurfacing
Resurfacing work of airport runway, 100’ wide x 5,000’ long, including milling, binder layer, wearing surface, and striping. Completed in 2023
Juanita Drive Improvements
City of Tuscaloosa, Alabama
Construction of drainage, street resurfacing, and pedestrian sidewalks in a residential area. Completed in 2024
500,000 Gallon/Day SBR WWTP
City of Cordova, Alabama
Constructed a 500,000 GPD SBR wastewater treatment plant with two SBR tanks, a detention tank, screen, and chlorine disinfection. Completed in 2013